Saqqara

AdvAmine™ and Dehydration Package- Egypt, 2007

  • Status: Delivered
  • Customer: BP
  • End user: BP
  • PROSERNAT’s scope: Design, engineering, procurement, conception of a gas sweetening unit (amine energizedMDEA) and a dehydration unit (TEG).
  • Capacity: 55 MMSCFD