C2C3

Refrigeration Package for C2C3 Recovery - Egypt

  • Status: Engineering
  • Customer:ENPPI
  • End User:GASCO
  • PROSERNAT’s scope: Design and supply of Propane Refrigeration Package for C2C3 recovery with 3x33% centrifugal compressors.
  • Capacity: 13 MW cooling duty (600 MMSCFD @ -37 °C)