News & Events

PROSERNAT News and Events


Events

Meet our representatives at the following events :

 



25-29 march 2012 - Abu Dhabi

Presentation of "Results of the 2.25 t/h Post-combustion CO2 Capture Pilot Plant of ENEL at the Brindisi Coal Power Plant and Last R&D Development for HiCapt+TM Process"

 

15-18 april 2012 - New Orleans
Presentation of "Development of technologies for CO2 capture from flue gases"


 

 Published papers : Available upon request

 


Gas Sweetening
  • Solutions for the Treatment of Highly Sour Gases (Gastech 2011)
  • Special H2S Extraction : a successful demonstration of new process for bulk H2S removal (Hydrocarbon Engeneering 2008)
  • Corrosion constrol on amine plants : new compact unit design for hish acid gas laodings (SOGAT 2008)
  • H2S bulk removal with the SPREX® process first operational results (GPA 2006) 
  • COS removal from natural gases  by absorption in Alkanolamine solution’s (GPA 2006)
  • Successful revamp of MDEA unit at Qatar petroleum increases capacity (GPA 2005)
  • A new look at Amines : extending the Gas Industry "workhorse" to new limits (GPA 2004) 
  • A critical look at Amines : a practical review of corrosion experience over four decades (GPA 2004)
  • As weet Solution : A case study on corrosion experienced in sweet amine units and a proposed solution (Hydrocarbon Engeneering 2004)

 


Sulfur

 

  • Clauspol Process : Improvements and Performances to Tail Gas Treatment (SULPHUR 2010)
  • Latest development of the clausol TGT process (AICHE 2003)
  • Sulfint : New redox process successful in high-pressure gas streams (Oil & Gas Journal 2001)

 


Gas Dehydration
  • Operation Feedback from the NKOSSA Drizo Gas Dehydration Unit Offshore Congo (LRGCC 2011)
  • DrizoTM revamping of offshore TEG unit improves NGL recovery : the Ekofisk challenge (GPA 2003)
  • Ifpexol : Methanol simplifies gas processing (GPA 1996)

 


Separation
  • The splif flow concept for three phases separation on floating separation facilities : Industrial experience and latest developments (2003)

 


CO2 Capture
  • Results of the 2.25 t/h post-combution CO2 capture pilot plant of ENEL at the Brindisi coal power plant and last R&D development HiCap+TM process (SOGAT 2012)
  • Development of technologies for CO2 capture from flue gases (Best paper award 2010)
  • HiCap+TM : a step forward for industrial post-combustion CO2 capture in flue gases (SOGAT 2010)

 

 

 

 


Module on delivery